Microgrid Name Generation Bus Minimum 1 hr Load (kW) Average 1 hr Load (kW) Average Daytime 1 hr Load (kW) Maximum 1 hr Load (kW) Minimum 1 hr Critical Load (kW) Average 1 hr Critical Load (kW) Average Daytime 1 hr Critical Load (kW) Maximum 1 hr Critical Load (kW) Existing Fossil Generation (kW) New Fossil Generation (kW) Existing Solar (kW) New Solar (kW) Existing Battery Power (kW) Existing Battery Energy Storage (kWh) New Battery Power (kW) New Battery Energy Storage (kWh) Existing Wind (kW) New Wind (kW) Total Generation on Microgrid (kW) Renewable Generation (% of Annual kWh) Emissions (Yr 1 Tons CO2) Emissions Reduction (Yr 1 % CO2) Average Outage Survived (h) O+M Costs (Yr 1 $ before tax) CapEx ($) CapEx after Tax Incentives ($) Net Present Value ($)
mg0 670 789 1,493 1,913 2,713 695 1,276 1,602 2,165 81 1,446 1,240 2,956 99 407 343 175 0 0 6,165 43 4,379 23 2,120 168,284 6,869,587 4,641,616 522,662
Summary None 789 1,493 1,913 2,713 695 1,276 1,602 2,165 81 1,446 1,240 2,956 99 407 343 175 0 0 6,165 43 4,379 23 2,120 168,284 6,869,587 4,641,616 522,662

Report Generated

2024-07-30 13:27:32.141211

User Warnings

More than one load voltage is specified on microgrid mg0. Check Oneline diagram to verify that phases and voltages of ['634a_data_center', '634b_radar', '634c_atc_tower', '675a_hospital', '675b_residential1', '675c_residential1', '692_warehouse2', '684_command_center', '652_residential', '611_runway', '645_hangar', '646_office'] are correctly supported by gen_bus 670.
Pre-existing battery battery_634_existing will not be utilized to support loads in microgrid mg0.
Pre-existing battery battery_684_existing will not be utilized to support loads in microgrid mg0.
Supporting critical loads across microgrids assumes an AMI metering system. If not currently installed, add budget for the creation of an AMI system.
Supporting critical loads across microgrids assumes the ability to remotely disconnect 3-phase loads.

Distribution Upgrades needed to create Microgrids

Microgrid Location Recommended Upgrade Component Count Cost Estimate ($)
mg0 mg0 Microgrid Design 1 100,000
mg0 mg0 Microgrid Controls 1 100,000
mg0 650632 SCADA disconnect switch 1 50,000
mg0 634a_data_center AMI disconnect meter(s) 1 300
mg0 634b_radar AMI disconnect meter(s) 1 300
mg0 634c_atc_tower AMI disconnect meter(s) 1 300
mg0 675a_hospital 3-phase relay(s) 1 20,000
mg0 675b_residential1 3-phase relay(s) 1 20,000
mg0 675c_residential1 3-phase relay(s) 1 20,000
mg0 692_warehouse2 3-phase relay(s) 1 20,000
mg0 684_command_center AMI disconnect meter(s) 1 300
mg0 652_residential AMI disconnect meter(s) 1 300
mg0 611_runway AMI disconnect meter(s) 1 300
mg0 645_hangar AMI disconnect meter(s) 1 300
mg0 646_office AMI disconnect meter(s) 1 300